内蒙古创源金属有限公司动力站一期6x330MW机组#2封闭煤场项目

发布日期:2023-04-20 浏览次数:350

工程位于内蒙古霍林郭勒,建筑面积40000 ㎡,跨度为100m,总用钢量约2000t。工程内容包括封闭煤场钢网架、钢檩条、单层压型彩板、阳光板、防腐油漆、防火、五金配件、封闭煤场本体的防雷接地(以断接卡为界限)、电气照明及安装检修用平台(马道)和扶梯等。

6x330MW Unit 2# of power station phase I of coal enclosure project for Inner Mongolia Chuangyuan Metal Co., Ltd.

The project is located at Huolingole, Inner Mongolia, with a construction area of more than40000 ㎡, a span of 100m, and a total steel consumption of about 2000 tons. The project scope includes closed space frame, purlin, single-laminated cladding sheet, sunlight sheet, anti-corrosion paint, anti-fire , Hardware accessories, lightning & earthing of the closed coal yard (bounded by the disconnect card), electrical lighting and maintenance platform (horse road).